01 DAN v3 - Floor plan
01 DAN v3 - Floor plan

 

This is the plan for ther electrical works. There is one slight change. All the electrical points now need to be 12 inches above the top of the boards please.

The electrical points above board 5 in the Veterans' Corner need to be the same height as all the other sockets - so that they're all at the same height all the way around the exhibition venue please.